City of Goodyear
Home MenuConstruction Meters
Temporary Construction Water Meter Request Form
Construction Meters - Potable Water
Installation Fee: | Non-refundable $150.00 |
Water Fees: | Monthly base fee is determined by the size of meter (see the meter list below). Fees for water used will be based on the tier system: |
Tier 1 | 0 - 40,000 gallons | $5.53 per one thousand gallons |
Tier 2 | 40,001 - 100,000 gallons | $8.85 per one thousand gallons |
Tier 3 | 100,001 gallons and over | $11.47 per one thousand gallons |
CAP FEE | $1.40 per one thousand gallons |
Deposit amount and monthly fee depends on the meter size and type (see Meter Size List below).
Reclaimed Meters
Installation Fee: | Non-refundable $150.00 |
Water Fees: |
Monthly base fee is determined by the size of meter (see the meter list below) |
Deposit amount depends on the meter size and type (see Meter Size List below).
Meter Size List
Meter Size | Monthly Fee | Meter Type | Deposit Amount |
3" | $84.87 | Turbo | $1,507.31 |
4" | $138.39 | Turbo | $3,115.85 |
6" | $262.65 | Turbo | $5,274.90 |
8" | $262.65 | Turbo | $8,161.29 |
3" | $84.87 | Hydrant Meter | $1,507.31 |