Drainage
This site has a master drainage report.
Preliminary drainage plan and report or memo showing compliance with master study is required (Section 3 of the EDS&PM).
- Memo Information found on checklist under the first 1-12 line items.
At a minimum the preliminary drainage plan shall show:
- Retention basins or other storage facilities and clearly indicate which areas of the project will drain to each retention basin/connected series of retention basins/storage facility.
- Contours, bottom elevations, high water elevations, 1 foot freeboard elevations, and volume provided shall be shown for each basin
- Drywells or bleed-offs for each basin over 1 foot deep and volume required in the contributing area
- Address offsite & onsite flows, weighted “C” values, and flood zone designations.
Water
City of Goodyear is the water service provider.
If a new or relocated potable water meter (and/or irrigation meter) is required to serve the site, a new public water easement may be required. Additional documentation for water easement will be required.
A separate final water design report or a memo referencing the master development study and how this site is in compliance with the master study is required.
- See section 5.1.1.D of the EDS&PM for requirements
- This memo/report should contain the basic items such as water demand, fire demand, and sizing of pipe diameters
- Memo Information found on checklist under the first 1-12 line items
Sewer
City of Goodyear is the sewer service provider.
A separate final sewer design report or a memo referencing the master development study and how this site is in compliance with the master study is required.
- See section 6.1.6.C of the EDS&PM for requirements.
- This memo/report should contain the basic items such as the sewer demand and sizing of pipe diameters.
157th Water Reclamation Facility (WRF) Service Area:
The 157th Ave (WRF) is currently in an enhanced monitoring period as required by ADEQ and MCESD. During this period, an at-risk wavier will be required to be signed, notarized, and provided to the City prior to issuing a sewer capacity letter or signing the MCESD Approval to Construct (ATC). The at-risk wavier will be recorded on the property by the City prior to permit issuance. Once the sewer capacity letter is requested, the at-risk wavier will be provided, with accompanying documentation on planned City projects to increase capacity at the plant, and additional information on the Enhanced Monitoring.
As-Builts
Traffic Study Information